How to use it
- Enter a waste quantity.
- Enter an ore quantity using the same unit and basis.
- Calculate the waste-to-ore ratio.
Search by tool name or category.
No tools found.
Divide an entered waste quantity by an entered ore quantity in the same unit.
This calculator reports a unit-consistent arithmetic ratio of waste material to ore material.
Strip ratio = waste material ÷ ore material.
300 waste units divided by 100 ore units gives a strip ratio of 3:1.
A strip ratio alone does not model geology, sequencing, costs, slope stability, equipment or mine design and is not operational guidance.