How to use it
- Enter total production in tonnes.
- Enter elapsed time in days.
- Calculate hourly, daily, 30-day and 365-day equivalents.
Search by tool name or category.
No tools found.
Convert an entered total tonnage over days into simple average rates.
This page converts total tonnes over entered days into average time-based equivalents.
Average daily rate = total production ÷ days; other outputs scale that daily average.
3,000 tonnes over 10 days gives an average of 300 tonnes/day and 12.5 tonnes/hour.
The monthly and yearly outputs are straight-line equivalents, not forecasts. Downtime, capacity, variability, logistics and safety are excluded.